| FP6 SUSTDEV Sustainable Energy Systems | ||||
| FP6 SUSTDEV 1.1.7 Grid Issues | ||||
| Electricity | ||||
Download
Work Programme (212 Kb PDF)
The demand for electricity is expected to grow significantly over the next decade, but the liberalisation of the energy market has lead to a significant reduction in the installed over-capacity of base load power plants. In some EU countries the demand for electricity peaks more often in summer than in winter, due to a very significant increase in the demand for cooling. In a growing number of regions the low voltage distribution network to the end users shows weaknesses. Some of these problems can be addressed by installing medium and small scale power generation units, including renewable electricity generating plants, in strategic locations to stabilise the grid instead of installing new power lines.
Priority areas:
Click here to submit reports for inclusion on the ManagEnergy website
Complete the Questionnaire to add your organisation to this website