• 'link_to #content'
  • 'link_to #container'
  • 'link_to #path'
  • 'link_to #langsSelector'
  • 'link_to #linkBoxToolw'

Installation of a Centralised System for Monitoring and Control of Heat in 13 Schools and Kindergartens in the Town of Veliko Tarnovo, Bulgaria

Type: CaseStudy

Case Study (19 KB PDF)

Summary

The material presents the results of a demonstration project for installation of a centralised system for energy management (monitoring and control of heat consumption) in 13 schools and kindergartens in the town of Veliko Tarnovo, Bulgaria. The aim was to show the benefits of energy management in public/municipal buildings as an option for energy savings and thus reduction of municipal energy costs in Bulgaria. Approximately 880 Gcal per year is saved which reduces the energy costs with € 12234. The pay back period is 2.61 years.

Results

Indicators Unit Preliminary results Final results
Heat Savings Gcal/year 606.25 879.84
Savings % 15.00 21.8
Heavy fuel oil savings T/year 83.34 120.95
Price of heavy fuel oil Euro/ton 101.15 101.15
Heavy fuel oil cost savings Euro/year 8429.84 12234.00
Investment Euro 31955 31955
Pay-back period Year 3.79 2.61

Contacts